News & Details
Home > News >Ball Mill Test Run Requirements

Ball Mill Test Run Requirements

12/05/2015

Inspection before test run:

(1) The workshop and surroundings around the equipment should be clean;

(2) Check whether there is subsidence or cracks on the foundation;

(3) Check the foundation bolts and bearing bolts to make sure they are tightened;

(4) Clean up the main bearing and transmission bearing and fill with enough lubricating oil;

(5) Inspect the water cooling device of the main bearing to ensure it is unimpeded and without leaking.

ball mill

Test run process and cautions:

(1) Before starting the motor, manually grind the mill for 2 to 3 times to check if there is any obstacles. Ensure the rotating direction is correct by the small gear driving the big gear upward and then boot the motor.

(2) After starting up, check the vibration condition of the main bearing and transmission bearing, together with the gear meshing sound, etc.;

(3) Conduct temperature inspection on main bearing and transmission bearing every 10 mins;

(4) Check and remedy the fastening situation of the bolts.

Quick Way to Get Price

Please tell us your materials, capacity and finished product design, we can offer better service for you. Contact Email: sales@hxjq.com

留言板
Product Name:
Your Name:
* Your Email:
* Your Phone:
* Your Country:
Message:

ABOUT US

Hxjq company is engaged in mining, crushing and screening equipment, sand making and washing equipment, urban construction waste mobile crushing screening equipment, etc...

Read More

CONTACT INFO

  • 0086-371-67833161
  • sales@hxjq.com
  • Tanxiang Road, High & New Technology Industries Development Zone of Zhengzhou,China.

PARTNER